|
|
|
 San Mateo County实验室
| 开发商: |
|
容积率: |
|
| 地址: |
San Mateo, CA |
建筑面积: |
• 29,000 sq. feet (2,690 sq. meters) |
| 竣工日期: |
February 2003 |
高度: |
|
| 能源利用: |
Energy demand has been reduced over 50% relative to the stringent California Title 24 energy requirements, and renewable energy systems supply all non-HVAC energy requirements. The building also incorporates green building materials and an aggressive recycling plan diverted over 78% of construction waste from landfills. This project demonstrates that integrated, high-performance design can produce a better workplace while substantially reducing operating costs and significantly reducing reliance on the electricity grid. |
| 选址和节水方案: |
|
| 室内环境品质: |
|
| 材料选择: |
All regularly occupied areas of the building are daylit, and office areas have operable windows. The orientation of the building, large roof overhangs, north-facing clerestory windows, and canted windows on the southwest reduce glare while maximizing daylight. |
| 设计创新: |
|
| 相关评论: |
|
|
|