 Steinhude游乐中心
| 开发商: |
|
容积率: |
|
| 地址: |
Steinhude, Germany |
建筑面积: |
• 3,190 sq. feet (296 sq. meters) |
| 竣工日期: |
June 2000 |
高度: |
|
| 能源利用: |
Energy self-sufficiency has been accomplished by photovoltaic panels, solar hot water collectors, a seed-oil fueled cogeneration microturbine, daylighting, natural ventilation, passive solar design, building automation, and high-performance materials. These systems provide complete lighting and power needs for the building, recharge a fleet of eight photovoltaic-powered boats, and also produce excess electricity to sell back to the utility grid. |
| 选址和节水方案: |
|
| 室内环境品质: |
Other sustainability practices incorporated into the design include graywater and harvested water systems, green materials, and waste reduction. |
| 材料选择: |
|
| 设计创新: |
|
| 相关评论: |
|
|