 Fallingwater仓库
| 开发商: |
|
容积率: |
|
| 地址: |
Mill Run, PA |
建筑面积: |
• 13,000 sq. feet (1,210 sq. meters) |
| 竣工日期: |
December 2004 |
高度: |
|
| 能源利用: |
|
| 选址和节水方案: |
|
| 室内环境品质: |
A zero-discharge wastewater reclamation system, graywater flushing, and low-flow fixtures reduce potable water use. A ground-source heat-pump system, daylighting, and electric light sensors minimize energy use. |
| 材料选择: |
The grand upper level of the original bank barn is used as a seasonal area for exhibits, lectures, and other social functions. The one-story 20th century addition now houses a multipurpose exhibit, conference, and distance-learning area. Existing glazed-block walls, glass-block windows, and site-built roof trusses are exposed. Sunflower-seed composite panels, sound-absorptive straw panels, and salvaged fir complement the palette of original materials while underscoring the structure’s connection to farming. |
| 设计创新: |
|
| 相关评论: |
|
|