Zion Visitor Center
点击查看原图大小
开发商: 容积率:
地址: Springdale, UT 建筑面积: 706 sq. meters
竣工日期: May 2000 高度:

能源利用: A 70% reduction in energy use was met through the design and implementation of natural ventilation, efficient lighting, effective glazing, insulation, passive downdraft cooltowers, Trombe walls, photovoltaics, energy-efficient landscaping, and an energy management system.

The roof insulation is Structural Insulated Panels (SIP’s). The walls are 6-inch steel studs with a spray-in-place foam insulation.

The cooltower design was adapted from a technique used to condition outdoor patio spaces. Hot dry air is drawn into evaporative cooling pads at the top of the tower. The air is now more dense and falls naturally through the tower into the space. High windows in the building relieve the hot air.

12% of the total energy load is provided by on-site PV, with an additional 10% allowed-for in the building design.
选址和节水方案: Green Strategies

Design for Materials Use Reduction
Reconsider whether all space demands in building program are needed
Recycling by Occupants
Specify recycling receptacles that are accessible to the occupants
Transportation of Materials
Prefer materials that are sourced and manufactured within the local area
室内环境品质: Using this site, previously a campground, avoided unnecessary impact of natural and cultural resources. No undeveloped lands were used. Underutilized, existing areas in Springdale were used for parking and facility development. Construction was phased to minimize disturbance. Topsoil was stockpiled, runoff was diverted to existing sediment-catching areas, existing vegetation was maintained, no soil was transported off site, and dust control was implemented in roadwork adjacent to the existing campground.

Native low-water-use grasses and shrubs were used for landscaping. Historic irrigation channels were restored. Collected rainwater joins river water and is diverted through a series of gravity-fed irrigation ditches. High-efficiency irrigation techniques and drip irrigation with a weather data controller were installed primarily to encourage the reestablishment of native vegetation. (It may be possible to achieve 100% reduction of potable water for landscaping after plant establishment.)
材料选择: Cool towers (which provide over 5 air changes per hour) and operable windows provide natural ventilation to building occupants. Thermal, ventilation, and lighting systems may be controlled by users. Extensive daylighting was implemented. The building remained unoccupied for 2 weeks following construction, while commissioning and final punch items were completed.
设计创新:
相关评论:


关于筑能 主编信箱 版权声明 免责条款 隐私保护 网站导航 诚聘英才 特别鸣谢 广告服务 法律顾问 联系我们
北京启迪筑能建筑信息技术有限公司  版权所有
电子邮件:topenergy@gmail.com   联系电话:010-62672228  传真:010-62672298
地址:北京市海淀区中关村东路66号世纪科贸大厦C座2607-2608号 邮政编码:100190
Processed in 0.053 second(s), 4 queries , Gzip enabled
京ICP备05066764号