用户名: 密 码:   
[RSS]   论坛 | 博客 | 百科 设为首页 |加入收藏| ENGLISH
筑能网
筑能网 产品中心测试 预评估中心 企业黄页 节能维权 宁波频道 CIHAF中国之家 节能通软件 会员中心 筑能网
首页 | 行业资讯 | 热点专题 | 政策标准 | 业界人物 | 会展培训 | 市场研究 | 技术研究 | 案例分析 | 绿色生活 | 资源导航
您现在的位置:  筑能网-中国绿色建筑|建筑节能行业门户网站   案例   其他建筑   Zion Comfort Station
Zion Comfort Station
点击查看原图大小
开发商: 容积率:
地址: Springdale, UT 建筑面积: 223 sq. meters
竣工日期: May 2000 高度:

能源利用: A 70% reduction in energy use was met through the design and implementation of natural ventilation, efficient lighting combined with daylighting, effective glazing, insulation, a passive downdraft cooltower, Trombe walls, energy-efficient landscaping, and an energy management system.
选址和节水方案: 20% of materials, including stone, concrete, and paving, were manufactured within 500 miles (800 km) of the site.
室内环境品质: Using this site, previously a campground, avoided unnecessary impact of natural and cultural resources. No undeveloped lands were used. Underutilized, existing areas in Springdale were used for parking and facility development. Construction was phased to minimize disturbance. Topsoil was stockpiled, runoff was diverted to existing sediment-catching areas, existing vegetation was maintained, no soil was transported off site, and dust control was implemented in roadwork adjacent to the existing campground.

Native low-water-use grasses and shrubs were used for landscaping. Historic irrigation channels were restored. Collected rainwater joins river water and is diverted through a series of gravity-fed irrigation ditches. High-efficiency irrigation techniques and drip irrigation with a weather data controller were installed primarily to encourage the reestablishment of native vegetation. (It may be possible to achieve 100% reduction of potable water for landscaping after plant establishment.)
材料选择: Cool towers (which provide over 5 air changes per hour) and operable windows provide natural ventilation to building occupants. Thermal, ventilation, and lighting systems may be controlled by users. Extensive daylighting was implemented. The building remained unoccupied for 2 weeks following construction, while commissioning and final punch items were completed.
设计创新:
相关评论:


关于筑能 主编信箱 版权声明 免责条款 隐私保护 网站导航 诚聘英才 特别鸣谢 广告服务 法律顾问 联系我们
北京启迪德润能源科技有限公司  版权所有
电子邮件:topenergy@gmail.com   联系电话:010-62672228  传真:010-62672298
地址:北京市海淀区中关村东路66号世纪科贸大厦C座2607-2608号 邮政编码:100190
Processed in 0.071 second(s), 4 queries , Gzip enabled
京ICP备05066764号