 Ramsey County Law Enforcement Center
| 开发商: |
|
容积率: |
|
| 地址: |
St. Paul, Minn. |
建筑面积: |
297,000 sq. feet |
| 竣工日期: |
October 2003 |
高度: |
|
| 能源利用: |
Building will use “green” power supplied by the District Energy St. Paul Inc. wood-waste-fired power plant.
Building envelope has high thermal performance factor.
Efficient lighting controlled by motion detectors.
HVAC system with economizer cycles and heat recovery equipment.
The months-long process of commissioning the facility's heating and ventilation system was conducted by a specialty subcontractor.
Implementing energy recommendations expected to result in 35 percent less energy use. |
| 选址和节水方案: |
Approximately 650 gallons of recycled latex paint used as base coat.
Demolition wastes separated and recycled: concrete, asphalt, steel, brick and mechanical equipment.
Pre-cast components – cells, floor structure, columns, and beams – reduced construction waste, and can be disassembled. |
| 室内环境品质: |
Redeveloped site with reuse of one structure.
Building oriented to maximize daylight for office spaces. |
| 材料选择: |
Conditioned air was circulated through the building for some time prior to the county taking possession to ensure that construction materials would properly dry and "off-gas." |
| 设计创新: |
|
| 相关评论: |
An emphasis on consolidation of services, including unfinished space for future judicial expansion, guided the facility design. Extension of District Energy St. Paul Inc. heating and cooling to this previously developed site allowed the county to avoid construction (and emissions) of an on-site boiler stack and cooling tower. An existing structure on the site is being renovated as the new St. Paul Police Department headquarters. |
|
|